Daikin Ductless Mini-Split installation in Greater Vancouver

Quick answer: A Daikin ductless mini-split installation in Greater Vancouver starts with a room-by-room heat loss and heat gain calculation rather than a guess based on square footage, and it ends with a written commissioning record covering vacuum, line length, charge adjustment and measured airflow. In between you need indoor head locations chosen around how each room is actually used, an outdoor unit position that satisfies clearance and noise requirements, a dedicated circuit installed by a licensed electrician, and a municipal permit. A straightforward single-zone or two-zone job usually takes one to two days on site.

The quote that says “supply and install one ductless heat pump” and nothing else is the one that causes trouble six months later. Not because the equipment is bad. Because nobody wrote down where the outdoor unit was going, who was pulling the electrical permit, whether the strata had approved the wall penetration, or what the line set length would do to the refrigerant charge.

Daikin ductless equipment is well built and forgiving of a lot of things. It is not forgiving of a system sized off floor area, a line set that was never properly evacuated, or a head mounted directly above a bed because that happened to be the easiest wall to drill. Those three decisions account for most of the unhappy ductless owners we meet across Metro Vancouver.

This page walks the full planning sequence the way HeatLand runs it, from load calculation through zone count, head placement, electrical, permits, strata paperwork, install day and commissioning. Read it before you sign anything. If you want a free written no-obligation estimate with the sizing math attached, call (604) 330-3812.

Talk to a local expert: (604) 330-3812 or request a free estimate — HeatLand, licensed & insured, Metro Vancouver since 1999.

What a Daikin ductless system actually is, and where it fits in local housing

A ductless mini-split is two pieces of equipment joined by a pair of insulated copper refrigerant lines, a control cable, and a condensate drain. Outside sits an inverter-driven compressor. Inside, one or more heads deliver conditioned air straight into the room. No ductwork anywhere.

That single fact is why these systems land so well in Lower Mainland housing stock. Post-war bungalows heated by hot-water baseboard have no duct chases to work with. Older walk-ups run on electric baseboard. Basement suites get carved out of homes whose original furnace was never sized to reach them. Laneway houses, additions built over a carport, converted attics, sunrooms with a wall of glass facing English Bay: all of these are rooms the central system cannot serve properly no matter how you balance it.

Daikin builds its ductless lineup around inverter compressors, so the outdoor unit varies its speed rather than slamming on and off. In practice that means longer, gentler run cycles and steadier room temperature. Every ductless heat pump also reverses, so the same box that cools in August heats in February.

Daikin offers several indoor styles: high wall, floor-standing console, recessed ceiling cassette, and slim concealed-duct units that hide in a soffit. Which one belongs in your room is a design decision, not a catalogue preference. Ask your installer which specific series your quote covers, then read that series’ own submittal sheet and warranty terms rather than trusting a general claim about “Daikin performance.” Capacities, sound ratings and low-temperature behaviour vary by series and by year.

Load calculation: the number that decides everything downstream

Sizing a ductless system by floor area is how people end up with a unit that short cycles all shoulder season and still cannot hold the living room on the coldest night of the year. Oversizing is the more common error, and with heat pumps it hurts more than it does with furnaces, because an oversized inverter spends its life at the bottom of its modulation range where efficiency and dehumidification both suffer.

A proper calculation is done room by room. The technician measures each space, notes window area and glazing type, checks wall and attic insulation where it can be seen, counts exterior wall exposures, records ceiling height, and estimates air leakage from the age and condition of the building envelope. A 1962 house with original single-pane aluminum sliders behaves nothing like the same footprint after a 2019 window and attic upgrade.

We then run both directions. Heat loss at the local winter design temperature sets the heating capacity. Heat gain in July, driven mostly by west and south glass, sets the cooling capacity. On the coast those two numbers usually disagree, and heating almost always wins. That is normal, and it is why a ductless system chosen purely as an air conditioner tends to be too small for winter.

Ask for the calculation in writing. You should be able to see the room list, the design temperatures used, and the resulting capacity per zone. If a contractor cannot produce that page, the sizing was a guess, and every downstream decision inherits the error.

Cold-weather capacity and whether you keep a backup heat source

Heat pump output falls as outdoor temperature drops, at exactly the time your house needs the most. That is physics, not a defect, and it applies to every brand. Cold-climate ductless models are engineered to hold a much larger share of their rated capacity down into deep cold, but the curve still bends.

What matters is the number at design temperature, not the number at 8 degrees. Metro Vancouver and the Fraser Valley have a mild winter design temperature by Canadian standards, which is why ductless works so well here, but Maple Ridge, Mission and Abbotsford see colder snaps than Kitsilano does, and an outflow wind through the Fraser Canyon changes the arithmetic for a week at a time. Ask your installer which capacity table they sized from and at what outdoor temperature. Verify it against the manufacturer’s published performance data for your exact model.

Then decide about backup. Three common paths: size the ductless to carry the full load and accept a few hours of reduced margin in a cold snap; keep existing electric baseboard in bedrooms as a rarely used backstop; or leave a gas furnace or boiler in place and run a dual-fuel arrangement where the ductless handles most of the season.

If you keep gas equipment, keep it maintained and keep CO alarms working. If you decommission it, that work is gas-fitting work and must be done by a TSBC-certified gas fitter with the line properly capped and the appliance disconnected to code. Do not leave a dead furnace connected to live gas.

Single-zone versus multi-zone: how many heads you actually need

One outdoor unit can serve one indoor head, or several. The choice is not simply about budget.

Single-zone systems pair one outdoor unit with one head. They modulate down further, they are simpler to diagnose, and if the compressor fails you lose one room instead of four. For a suite, a laneway, a home office over the garage, or an open main floor where air moves freely, single-zone is usually the right call.

Multi-zone runs several heads off one outdoor unit through a branch arrangement. It saves outdoor wall space, which matters on a narrow Vancouver lot or a townhouse with one small patio. But there is a catch worth understanding before you commit: with most conventional multi-zone systems, all the connected heads must operate in the same mode. If one head calls for cooling while another wants heat, the system cannot do both at once. Shoulder season in a house with a hot west-facing room and a cold north bedroom is exactly when that limitation shows itself.

The second catch is minimum output. A multi-zone outdoor unit sized for four heads has a floor below which it cannot modulate. Run only one small head in April and the system may cycle rather than run smoothly.

Our rule of thumb: rooms with genuinely different loads and different schedules do better on their own systems where the site allows it. Rooms that behave similarly can share. Ask which configuration your quote assumes and why, and get the answer in writing before deposit.

Indoor head placement: what a technician looks at before drilling

Head placement is where a good install separates itself, and it takes ten minutes of thinking to get right.

The head needs an unobstructed throw across the room. High-wall units push air along the ceiling and let it fall as it cools, so a unit blowing into a bulkhead, a tall wardrobe or an open loft rail loses most of its reach. In heating the opposite problem appears: warm air wants to stay at the ceiling, which is why a floor-standing console under a window often outperforms a high wall unit in a bedroom or a room with cold perimeter glass.

Do not mount a head where it blows directly onto a bed, a desk chair, or a dining table. The complaint we hear most often about ductless is draft, and it is nearly always a placement problem rather than an equipment problem.

Behind the wall matters too. The unit needs a path for the line set, the drain and the wiring, and that path must clear studs, plumbing stacks, electrical runs and structural headers. In older homes with balloon framing or knob-and-tube remnants, we open a small inspection point rather than guessing.

Drainage is the quiet constraint. Condensate leaves a wall head by gravity, so the drain must fall continuously from the unit to its termination. If the only good spot for a head has no downhill path, the fix is a small condensate pump, correctly wired to shut the unit down on a float alarm. Plan it, do not improvise it on install day.

Siting the outdoor unit: clearance, noise, salt air and drainage

The outdoor unit needs to breathe, drain, sit level and stay quiet. Four constraints, and on a tight lot they fight each other.

Clearance comes first. The manufacturer publishes minimum distances at the coil face, the discharge, the service side and above. Tucking a unit into an alcove or hard against a fence starves it and lets discharge air recirculate straight back into the coil, which quietly destroys performance in both seasons. Follow the installation manual for that model, not a rule of thumb.

Noise is a real planning item in Metro Vancouver. Municipalities regulate sound at the property line, strata bylaws often add their own limit, and the neighbour’s bedroom window is frequently three metres from the only good wall you have. Site the unit away from bedroom windows on both properties where possible, and use anti-vibration mounts. A rubber-isolated wall bracket or ground pad keeps compressor hum out of the framing. Wall-mounting to a bedroom wall of your own house is a decision people regret.

Salt air matters west of about Boundary Road and along the water in White Rock, Steveston, Tsawwassen and the North Shore waterfront. Salt attacks aluminum fins and steel cabinets. Ask about coastal coil coatings for that specific model and rinse the coil with fresh water a few times a year.

Finally, drainage and elevation. In heating mode the outdoor coil sheds meltwater during defrost. Raise the unit on a stand or bracket so it is clear of standing water, leaf litter and sitting snow, and keep the pad drained away from the foundation.

Line sets, wall penetrations and condensate routing

The refrigerant line set is two copper tubes, individually insulated, running from the outdoor unit to each head. How it is routed decides how the install looks, how it performs, and how long it lasts.

Length and vertical separation both have limits, published per model, and both affect refrigerant charge. Long runs require additional refrigerant, calculated from the manufacturer’s chart and weighed in, not guessed by feel. Ask for the recorded line length and any added charge to appear on your commissioning sheet. Exceeding the maximum lift or maximum length is a warranty problem waiting to happen.

Indoors, the ideal route is short and concealed. Through a floor joist bay, down a closet wall, out below the head. Where concealment is impossible, exterior line-hide covering keeps the run tidy and protects the insulation from UV, which turns bare foam brittle within a few coastal summers.

Every penetration through the building envelope has to be sealed properly. Drill with a slight downward pitch to the outside, sleeve the hole, seal it with the correct sealant, and finish the exterior with a proper flashing detail rather than a bead of caulking. On rainscreen assemblies common in Lower Mainland buildings post-leaky-condo era, a penetration done casually can channel water into the wall. If your building is rainscreened, the penetration detail should be reviewed before anyone drills.

Condensate lines need continuous fall, insulation where they pass through unconditioned space, and a termination that will not ice over or discharge onto a walkway. Terminating into a downspout or splash block is usually fine. Terminating over your front steps is not.

Not sure which option fits your home? Call (604) 330-3812 or book a free estimate.

Electrical: dedicated circuit, disconnect and panel capacity

A ductless system is a permanent appliance on its own circuit. It does not plug into a bedroom outlet, and any quote suggesting otherwise should be set aside.

Each outdoor unit gets a dedicated breaker sized to the manufacturer’s specification, with wire gauge and overcurrent protection matched to that model’s nameplate and installed to the current BC electrical code by a licensed electrician who pulls an electrical permit. A local disconnect near the outdoor unit is standard and makes future service safer. Interconnecting cable between the outdoor and indoor units must be the specified type and conductor count, run continuously without junction boxes buried in a wall.

The question that catches people is panel capacity. Many older Lower Mainland homes still run 100 amp service, sometimes with a fuse panel or a full breaker panel with no free spaces. Adding a heat pump on top of an electric range, an electric water tank and existing baseboard can push you past what the service will carry. There are three usual outcomes: there is room and you proceed, a load calculation shows you can stay within the existing service, or you need a panel upgrade or a service upgrade coordinated with BC Hydro. That last one adds cost and lead time, so find out early rather than on install day.

Have the electrical load calculation done during quoting, not after deposit. If a service upgrade turns out to be needed, it changes your budget and your schedule, and you deserve to know that before you commit. HeatLand coordinates the electrical scope so the two trades are not blaming each other on site.

Permits, TSBC certification and decommissioning old gas equipment

Permits are not optional and they are not paperwork theatre. In Metro Vancouver and the Fraser Valley, mini-split installs generally require an electrical permit for the new circuit, and depending on the municipality a mechanical or building permit for the equipment and the envelope penetration. Requirements differ between the City of Vancouver, Surrey, Burnaby, Coquitlam, Langley Township and the rest, so confirm with your own municipality’s building department or have your contractor do it and show you the permit number.

Permits matter for three practical reasons. An inspection catches mistakes before they are buried in a wall. Rebate programs frequently require permitted work by a qualified contractor. And when you sell, an unpermitted mechanical alteration can surface during a home inspection or a title search and stall the deal.

If your project involves removing or abandoning a gas furnace, boiler, or water heater, that scope crosses into gas fitting. In British Columbia gas work is regulated by Technical Safety BC and must be performed by a certified gas fitter under the appropriate permit. The gas line has to be properly isolated and capped, and the appliance venting dealt with. An abandoned chimney or B-vent left in place with another appliance still connected to it can create a venting problem that did not exist before. That is a real safety issue, not a formality.

If you ever smell gas or a CO alarm sounds, leave the home first, then call the gas utility and a licensed technician from outside. Never bypass a safety lockout on any appliance to keep it running.

Strata approval, heritage rules and older building constraints

In a strata, the exterior wall and often the balcony are common property, and you do not get to drill them because the unit inside is yours. Expect to submit a written request to the strata council, usually with a site sketch showing the outdoor unit location, the mounting method, the penetration point, and the equipment’s published sound rating.

Many Lower Mainland stratas have adopted a heat pump policy since summer cooling became a priority. Some designate approved locations. Some cap sound at the unit or at a neighbouring window. Some require an indemnity agreement making the owner responsible for the penetration and any resulting water ingress. Some require the work be done by a licensed, insured contractor with proof of coverage filed before work starts. Read your own bylaws and any council resolution rather than relying on what a neighbour was allowed to do three years ago.

Build in time. Councils meet monthly, and an approval that needs an AGM vote can take a season.

Outside strata, older housing brings its own constraints. Heritage-designated properties and homes in conservation areas may face restrictions on visible exterior equipment on street-facing elevations. Rainscreened buildings need a considered penetration detail. Homes with asbestos-containing materials in older plaster, vermiculite insulation, or textured ceilings require proper hazardous materials assessment before anyone cuts, and that is regulated work.

None of this stops a ductless install. It changes the sequence. Sort approvals and assessments during planning and install day stays a one-day job instead of a three-visit saga.

What actually drives the cost of a ductless install

We do not publish prices, because a number without your house attached to it is meaningless and every honest contractor knows it. What we can do is tell you exactly which variables move your quote, so you can read two proposals and understand why they differ.

Zone count and capacity are the obvious ones. Beyond that: line set length and difficulty, because a run through a finished basement ceiling and up two floors is a different day than a head mounted on the same wall as the outdoor unit. Concealment, because chased and drywalled line routing costs more than exterior line-hide. Indoor unit style, since ceiling cassettes and concealed-duct units need framing work that a high wall head does not.

Electrical is a big swing factor. A spare double-pole space in a modern panel is cheap. A full panel change or a service upgrade with BC Hydro coordination is not.

Then the site items: outdoor mounting method, whether a stand or bracket or pad is needed, condensate pump requirements, permit fees which vary by municipality, strata engineering or documentation, decommissioning of old gas equipment, and any envelope repair on an older exterior.

What should never differ between quotes is scope clarity. A proper proposal itemizes equipment series, zone capacities, electrical work and who is doing it, permits included or excluded, line set treatment, and commissioning. A one-line price hides the parts that get argued about later.

HeatLand provides a free written no-obligation estimate with the sizing basis attached. Call (604) 330-3812 and we will book a site visit.

Rebate and program paperwork: the sequence that protects your application

Heat pump incentive programs in British Columbia run through CleanBC, BC Hydro and FortisBC, sometimes with municipal top-ups layered on. Program names, eligibility rules, funding levels and deadlines change, and they change without much notice. We will not quote amounts here, because a stale number in an article is worse than no number.

What does not change is the sequence, and the sequence is where applications get lost.

Check eligibility before you buy. Some programs require a pre-installation step such as an energy assessment, a registered account, or a pre-approval, and doing it after the fact disqualifies you. Some require the equipment to appear on a specific eligible product list. Some require the installation to be performed by a contractor registered with the program. Some require the heat pump to replace a specific existing heating system, which means what you take out matters as much as what you put in.

Keep the paper. Dated invoice with the exact model and serial numbers, permit numbers, contractor licence details, and any pre and post assessment reports. Scan everything the day of installation.

Mind the clock. Most programs impose a submission window measured from the invoice date, and missing it is final.

Confirm current requirements directly with CleanBC, BC Hydro or FortisBC for your address and your situation, or ask us to walk you through what applies before we order equipment. Renters and strata owners have different pathways again, and if you rent, the program rules and your tenancy questions belong with the BC Residential Tenancy Branch and your landlord.

Installation day: what happens, and what you should be doing

For a single-zone job, plan on most of a working day. Two zones typically runs into a second day. Multi-zone with concealed routing can be three.

The crew starts with a walkthrough confirming everything agreed in the proposal: head location, outdoor unit position, line route, drain termination, electrical path. This is your last easy chance to change something. Speak up now, not after the hole is drilled.

Then protection goes down. Drop sheets on the floor, plastic over furniture near the work, and a plan for dust at the drilling point. Interior work follows: mounting plate levelled and fastened into structure, penetration drilled with the correct pitch, indoor unit hung, line set flared and connected, drain run and pitched, wiring pulled.

Outside, the pad or bracket goes in with isolation, the outdoor unit is set level, and the line set is dressed, insulated and secured. The electrician runs the dedicated circuit and disconnect, either the same day or on a coordinated visit.

Before any refrigerant is released, the system is pressure tested and evacuated. That step takes real time and it is not skippable. Then startup, controls setup, and a walkthrough with you.

What you should do: clear the work areas beforehand, keep pets in a closed room, make sure the crew can reach the panel and the outdoor location, and be available at the end for the handover. Ask them to show you the filter removal, the drain, the breaker and the disconnect. Ten minutes then saves a phone call later.

Commissioning numbers and your first year of ownership

Commissioning is what separates equipment that lives its full life from equipment that fails in year four. Ask for it in writing.

A proper record shows the system was pressure tested and held, that a deep vacuum was pulled and verified with a micron gauge and held after the pump was isolated, the measured line set length, any refrigerant added per the manufacturer’s chart, the torque values used on flare connections, supply and return air temperatures at each head in both modes, and the voltage and current draw at the outdoor unit. Moisture and air left inside a refrigerant circuit are the slow killers of a mini-split, and only a verified vacuum removes them.

Register the warranty immediately. Daikin warranty terms vary by series and often depend on registration within a set window after installation, and on installation by a qualified contractor. Read your own warranty document rather than assuming coverage.

Ownership afterward is light but not zero. Wash the indoor filters roughly monthly during heavy use, more often with pets. Keep the outdoor coil clear of leaves, cedar debris and blackberry growth, which is a genuine issue in Fraser Valley yards. Rinse the coil with fresh water if you are near salt air. Make sure the condensate drain runs freely, especially before cooling season.

Once a year, have it serviced: coil cleaning, blower wheel inspection, drain flush, electrical connections checked, refrigerant performance verified against the commissioning baseline. That baseline is the reason the annual visit is useful. Without it, nobody knows what normal looked like.

Quick Checklist

  • Get a written room-by-room heat loss and heat gain calculation, with the design temperatures listed, before any equipment is selected
  • Confirm the exact Daikin series and indoor unit style on the quote, then read that series’ own submittal sheet and warranty terms
  • Decide zone count deliberately, and understand that most multi-zone systems cannot heat one room while cooling another
  • Walk every proposed indoor head location and check throw, obstructions, drainage fall and whether it blows at a bed or desk
  • Verify outdoor unit clearances against the installation manual, plus municipal and strata noise limits at the property line
  • Have an electrical load calculation done during quoting to find out early if a panel or service upgrade is needed
  • Confirm which permits your municipality requires, and get the permit numbers on your paperwork
  • Submit strata approval paperwork early, with a site sketch, mounting detail and published sound rating
  • Check current CleanBC, BC Hydro or FortisBC program requirements before you buy, and keep every dated document
  • Insist on a written commissioning record showing vacuum verification, line length, added charge and measured temperatures
Planning stage What gets decided Who handles it
Site visit and load calculation Room-by-room heating and cooling capacity, zone count, equipment series HeatLand technician, with homeowner input on room use
Head and outdoor unit siting Placement, throw, clearances, noise exposure, drain path, penetration points HeatLand, reviewed with homeowner and strata where applicable
Electrical assessment Dedicated circuit size, disconnect, panel and service capacity Licensed electrician, coordinated by HeatLand
Approvals and permits Electrical and mechanical or building permits, strata resolution, hazardous materials assessment if required Contractor pulls permits; homeowner submits strata request
Rebate eligibility Program requirements, pre-installation steps, eligible equipment and contractor status Homeowner confirms with CleanBC, BC Hydro or FortisBC; HeatLand supplies documentation
Installation Mounting, line set routing, penetration sealing, condensate, wiring, gas decommissioning if applicable HeatLand crew, TSBC-certified gas fitter where gas work is involved
Commissioning and handover Pressure test, verified vacuum, charge adjustment, measured performance, controls walkthrough HeatLand technician, documented and given to homeowner
First year Warranty registration, filter cleaning, coil care, annual service against the commissioning baseline Homeowner for filters; HeatLand for annual service

Frequently Asked Questions

How long does a Daikin ductless mini-split installation take?

A single-zone install in a straightforward location is usually most of one working day. Two zones typically extends into a second day. Multi-zone systems, concealed line routing through finished walls, ceiling cassettes needing framing, or a panel upgrade can push the job to three days or a second scheduled visit. Permits, strata approval and electrical coordination happen before install day, so sorting those early is what keeps the on-site work short.

Do I need a permit for a ductless heat pump in Metro Vancouver?

Almost certainly yes for the electrical work, and often for the mechanical installation as well. Requirements differ by municipality across Metro Vancouver and the Fraser Valley, so confirm with your own building department or have your contractor confirm and give you the permit numbers. Permitted work matters for inspection, for most rebate programs, and at resale, when an unpermitted mechanical alteration can surface during a home inspection and delay a sale.

Will a Daikin mini-split heat my home through a Lower Mainland winter?

Coastal BC has a relatively mild winter design temperature, and cold-climate ductless equipment is engineered to hold a large share of its capacity well below freezing. The honest answer depends on your sizing. Ask which capacity table your installer used and at what outdoor temperature, and check it against the manufacturer’s published performance data for your exact model. Some homeowners keep existing baseboard or a gas appliance as backup for cold snaps.

Can I put one outdoor unit on several rooms?

Yes, that is a multi-zone system, and it saves outdoor wall space on a narrow lot or a small patio. Two limits are worth knowing. Most conventional multi-zone systems require all connected heads to run in the same mode, so you cannot heat one room and cool another simultaneously. And a multi-zone outdoor unit has a minimum output, so running a single small head in shoulder season may cause cycling rather than smooth modulation.

What does a ductless installation cost in Greater Vancouver?

It depends on zone count, capacity, line set length and difficulty, whether the line routing is concealed or covered externally, indoor unit style, and your electrical situation. A spare breaker space is inexpensive; a panel or service upgrade is not. Municipal permit fees, outdoor mounting method, condensate pumps and gas decommissioning all move the number. HeatLand provides a free written no-obligation estimate with the sizing basis attached. Call (604) 330-3812.

Does my strata have to approve the outdoor unit?

Usually yes, because the exterior wall and balcony are typically common property. Expect to submit a written request with a site sketch showing the unit location, mounting method, penetration point and the equipment’s published sound rating. Many stratas now have a heat pump policy that designates locations, caps noise, or requires an indemnity agreement and proof of contractor insurance. Read your own bylaws, and allow time, since councils meet monthly.

How do I know the installation was done properly?

Ask for the commissioning record. It should show a pressure test that held, a deep vacuum verified with a micron gauge and held after the pump was isolated, the measured line set length, any refrigerant added per the manufacturer’s chart, and supply and return air temperatures at each head in both heating and cooling. That document is also your baseline, so future service visits can compare against how the system performed when it was new.

What maintenance does a ductless system need?

Wash the indoor filters about monthly during heavy use, more often with pets. Keep the outdoor coil clear of leaves, cedar debris and blackberry growth. If you are near salt water, rinse the outdoor coil with fresh water a few times a year, since salt attacks aluminum fins. Check that the condensate drain runs freely before cooling season. Once a year, book a professional service for coil cleaning, drain flush, electrical checks and performance verification.

HeatLand Heating & Cooling — family-run, licensed and insured, TSBC-certified gas fitting, all major brands, financing available. Call (604) 330-3812, email info@heatland.ca, or request a free estimate.

Reviewed by the HeatLand Heating & Cooling team — licensed, insured, TSBC-certified HVAC contractor serving Metro Vancouver & the Fraser Valley since 1999. Error codes, specifications, pricing and rebate programs vary by model and change over time; confirm details against your unit’s own manual, a written quote, and the manufacturer or CleanBC/FortisBC. If you smell gas or your CO alarm sounds, leave the home and call the gas utility and a licensed technician from outside.

Get your free estimate

Tell us what's going on and we'll get right back to you — no pressure, no obligation.

  • Free, no-obligation quotes
  • All major brands serviced
  • Metro Vancouver & the Fraser Valley
  • Financing & CleanBC rebate help
Prefer to talk now? Call (604) 330-3812

We'll only use your details to contact you about your request.